Sunday, April 5, 2009
Walls and Staging Up
We have stagged half of the house and are ready to stack the last remaining courses and prepare for the pour early next week. The bucks for the walk out section of the foundation were built by the students at CTE and are ready to be placed. A couple of Naylor and Breens staff worked with us as they prepare for their first ICF project. The boys from Rugg Concrete are also ready to pour the uninsulated garage walls and we will pour both sections of the foundation walls together. We will have to push tomorrow and Tuesday to make sure that Wednesday we are ready, this depends on the weather and our willingness to get wet.
Thursday, April 2, 2009
Footings are set and poured
Roger and crew, Nate, Jamie and Joe set and poured the 200 + linear foot footing yesterday with no issues. Harrison Concrete brought in their big pump truck to make the reach 100+ feet. We plan on laying out and starting to set ICFs once the footing is stripped. The weather should work out for us over the next few days and if everything works out and the students are ready to push we should be setting staging early tommorrow and pouring early next week.
Tuesday, March 24, 2009
CTE Ground Breaking
Spring is here and Vermont ICF is ready to get their hands dirty. Our most exciting project this spring is going to be working with the Center for Technology in Essex, VT on the foundation of a residential house. Working hands on with students from a tech center will be a first for Vermont ICF and will be a great experience for us and something that we hope will transition into a larger program throughout the state. I will posting a basic blog about this project during our involvement and if the students do not traditionally blog their projects I hope to encourage them to do so. We will begin setting forms the week of March 30 and hope to pour the walls be the end of the week.
Subscribe to:
Posts (Atom)